Survey Work Including Layout Of Alignment After Removal Of Earth And Marking The Pile Points To Start The Pile Driving, Checking Of Level Of Pile Cap, Abutment, Return Wall Etc. And Also Checking Of Level Of Road Deck And Final Alignment Of Entire Stretch Of The Rob Along With Formation And Road To Be Constructed At Chaibasa Rob (No. 27b), Jharkhand.